Slightly delayed with this post, as we were in Toronto last week (Rob had a conference and I had a mini holiday). So this post is what we did the weekend of October 25/26.
We worked on the east face--did all the grey boards on either side of the big garage door, then finished the Tyvec on the peak, and then prepped for the installation of the white trim boards. That took awhile and the clock was ticking, because....we had to move the remaining 60 some Hardie plank boards over the side of the garage so I (and the rest of the cars) could park in the garage before winter came. So we moved the boards in clumps of about 4 or 5--they are very long and very heavy and don't want to snap them. Then we swept out the grit and moved tools around, and finally, voila, we can park in the garage once more!
Monday, November 10, 2014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment